Airport Runway Stabilization with Natural Enzyme Treatment: A Case Study
A regional airport in the American Southwest needed to rehabilitate a 2,400-meter runway base without closing the facility. TerraRoads™ enzyme stabilization delivered a 383% CBR increase, 22% water reduction, and $340,000 in savings versus the cement alternative — with zero facility downtime.